| Is a permit needed? | Under section 145(א)(2) of the Planning and Building Law (חוק התכנון והבנייה), an “internal change in an apartment” doesn’t need a permit: a change that doesn’t touch the exterior, the structural frame, the common property or pipes serving other apartments, doesn’t harm others, and doesn’t change the area or the number of units. “Apartment” in the section also includes a unit for a business. | In our reading, moving a partition that isn’t part of the structural frame can meet this test. Write it in plain words, for a clinic owner too, and send the client to check with the local committee. |
| The exemption list | The 2014 permit exemption regulations (תקנות הפטור מהיתר) list pergolas, signs, air conditioners and replacing a component in the same place. They have no item for internal partitions. Closing in a balcony, non-conforming use (שימוש חורג) and demolishing a building or part of it require a permit under separate regulations from 1967. | Someone looking for a “permit exemption” for a wall is looking in a different list. That’s a good topic for an article. |
| Who plans a partition? | The Engineers and Architects Regulations (תקנות המהנדסים והאדריכלים) from 1967 reserve planning in residential and office buildings for a licensed architect (אדריכל רשוי), with an exception for a simple residential structure. The Third Schedule (התוספת השלישית) excludes from them the demolition and building of partitions that aren’t part of the structural frame, openings in internal walls, internal changes and dropped ceilings, if the person doing them is an architect listed in the register, a practical engineer in architecture or a practical engineer in interior planning and design. | If you’re one of the three, write that, and what it allows. If not, write who plans walls at your studio. |
| And a load-bearing wall? | A partition that’s part of the structural frame isn’t in the schedule. Stability calculations are reserved for a licensed structural engineer, and in a simple structure also for an engineer or practical engineer registered in the right section. Under regulation 2 of the Contractors Registration Regulations (תקנות רישום קבלנים) from 1984, work that touches the structural frame is done only by a registered contractor, whatever the amount. | Write who checks the wall, and at what stage. No home page we checked mentions an engineer. |
| Who builds? | Under section 1 of the Contractors Registration Law (חוק רישום קבלנים), construction includes “interior construction,” and a contractor is someone who takes on such work for someone else. Under section 14 and the regulations, above an amount set for one construction site, only a registered contractor does the work. Renovations have a sub-branch, 131. | Write whether you do the work, or accompany a contractor who signed with the client. In our reading, someone who takes on a renovation above that amount needs to be registered. It’s worth checking with a lawyer. |
| Business: change of use | Section 145ה allows approval of a change of use for business purposes, with no additional permit, under conditions: among others, that the plan permits the use, and that the application doesn’t include work that requires a permit. The authority decides within 30 working days. The procedure was set in regulations from 2025. | On the page for businesses, write that you check what’s allowed at the place before signing a lease, and who takes care of it. |
| Business: accessibility | Regulation 7(ד) of the accessibility regulations for an existing building (תקנות הנגישות לבניין קיים) from 2011: someone who isn’t a public authority and is required to provide accessibility includes accessibility adjustments in any renovation that involves a change to internal partitions or openings. In the law, a public place includes an office, a clinic, a beauty salon, a restaurant and a store. | Write that this is a question for the start of planning, with an accessibility consultant (מורשה נגישות). We read the regulation and the definitions, not all the exceptions. |