| Designer of the building’s frame | Someone authorized to submit static calculations under the Engineers and Architects Regulations (תקנות המהנדסים והאדריכלים), who signed the permit application as responsible for designing the frame and for design supervision of its construction (regulation 1). The permit applicant appoints them, unless a particular application doesn’t need one (regulation 27). | Write the name of the role, not just “konstruktor.” That’s the term the client will see on the permit application. |
| Who may design the frame | In residential, office, business and public buildings, determining the structural system, calculating stability and submitting them are reserved for a licensed engineer in the structural engineering section. In a simple building, an engineer registered in the structural engineering section and a practical engineer registered in the building section (מדור בנייה) may also do it (First Schedule to the Reserved Activities Regulations, items 1 and 2). | Write your status and section: “licensed engineer, structural engineering section.” As the text reads, spatial static calculations are reserved for a licensed engineer, with no exception for a simple building. |
| Design supervision | Site visits in the number and at the times required, a check of the main elements on each floor and approval of the pour for each slab, and updating the plans and calculations if something changes (regulations 91 to 94). It’s allowed to send an employee with the required qualifications. | In our reading, this isn’t constant on-site supervision. Write how many visits are planned and at which stages, so the client doesn’t think someone is on site every day. |
| Person responsible for construction inspection | The permit holder appoints them before work starts (regulation 71). They’re registered in architecture or in civil engineering, in the structural engineering section, the “management and execution” section or the “construction management, execution and supervision” section, and in a simple building it can also be a practical engineer. They inspect at least at the marking of the building lines, at the completion of the foundations, of the frame and of the building, and report to the licensing authority (רשות הרישוי) within five days (regulations 87 and 89). | If you take on the role, write it by its name, with the stages. If not, write who usually fills it. |
| Person responsible for building the frame | Appointed on behalf of the contractor, and registered in civil engineering in one of the sections listed, and in a simple building it can also be a practical engineer. By definition, the person responsible for inspection isn’t the person responsible for building the frame. And under regulation 90א, the engineers’ responsibility doesn’t release the contractor. | If you also work with contractors, keep it separate on the website: who’s on the homeowner’s side, and who’s on the contractor’s side. |
| Safe room in an existing building: the permit route | A part of the Building Licensing Regulations (חלק ט׳1) that is a temporary order for five years from January 18, 2022: a shortened application, and for a safe room of up to two stories there’s no obligation to appoint a person responsible for inspection. The route doesn’t apply if the work requires strengthening under Israeli Standard 413 (regulations 101ב and 101ג). | Write which route you work in, and until when it’s in force under the regulations. |
| Safe room in a ground-level house: exemption from a permit | A temporary order from October 26, 2023, extended in the Collection of Regulations (קובץ התקנות) of October 19, 2025 from two years to three. It requires approval from a registered structural engineer (מהנדס מבנים רשום) before the work, and after it, their approval of the safe room’s stability and that the frame wasn’t damaged (regulations 30ב to 30ד). An application submitted during the period continues to be reviewed (regulation 30ו). | In our reading, the route ended on October 25, 2026, and in the Collections of Regulations up to October 29, 2026 we found no extension. If your website says “safe room without a permit,” check and update it. |
| “Building requiring strengthening” (מבנה הטעון חיזוק) under Amendment 139 | A building whose permit was issued before January 1, 1980, or between 1980 and 1984 if a licensed engineer in the structural engineering section gave an opinion that it wasn’t built to Israeli Standard 413. The building has at least two stories and four apartments (section 70א of the Planning and Building Law (חוק התכנון והבנייה)). | For a building from the early ’80s, your opinion is the way in. Explain what gets checked, and who may sign. |