Website for a solar installer The Ministry of Energy already told the customer what to demand. No website we checked talks about it.

Someone looking for a solar system first asks how much it returns. But that number moves: in October 2026 the Electricity Authority (⁧רשות החשמל⁩) published a hearing on a lower tariff for connection requests from 2027. And the Ministry of Energy (⁧משרד האנרגיה⁩) published a spec (⁧מפרט⁩) for customers that says what to demand from an installer, and recommends getting 3 to 5 proposals. Here you’ll find what it says, what we saw on installers’ websites, and what’s worth building. You can use this even if you don’t work with us.

Based on a check of 20 websites. Updated 2 November 2026.

Illustration: All the details are examples. Your website gets your real name, approvals, terms and area.

Two customers, and one website that has to answer both.

Roof owner

“They say it pays for itself. Is that true for my roof?”

A private house, a free roof, and a neighbor who already installed. They got one proposal, maybe two, with a profit table they don’t know how to check. They want to understand which tariff it relies on, and who’s responsible if the roof leaks.

What they search for, for example

What they need to find on the site

  • How the profit is calculated, and on which tariff
  • What’s included in the price
  • Warranty, and on what exactly
  • What happens with the roof and the waterproofing

Committee or business

“The roof is shared, and everyone has to agree”

A building committee, a business owner or a farm. The system is bigger, and the decision isn’t one person’s. They need something they can pass on, and it has to be clear who handles the approvals and who maintains it afterward.

What they search for, for example

What they need to find on the site

  • Who handles the approvals
  • Jobs of a similar size
  • Who maintains it after installation
  • Who takes part in the decision

We checked 20 websites of solar installers in Israel, the way a customer sees them on a phone.

We searched for installers in six areas and went into their websites. None mentions the Ministry of Energy’s spec, and none writes the tariff in agorot. Only one tells about the Electricity Authority’s hearing, and only 2 give a number for return on investment.

  • 0 of 20

    Mention the Ministry of Energy’s spec

    None. Writing “our proposal follows the spec” answers what the ministry tells the customer to ask for.

  • 1 of 20

    Tell about the hearing on the tariff from 2027

    Only one, with an update date and a source, and it says this is a draft. That’s exactly what a customer is looking for right now.

  • 0 of 20

    Write the tariff in agorot

    None. Without this number, no profit calculation can be checked.

  • 7 of 20

    Talk about yield or return on investment

    About a third. It’s the customer’s first question, and it depends on the tariff.

  • 2 of 20

    Give a number for return on investment

    Only 2. A number like that depends on the tariff and the assumptions, so it’s worth writing them next to it.

  • 0 of 20

    Write about a structural engineer’s approval or an inspecting electrician (⁧חשמלאי בודק⁩)

    None. The spec recommends that the installer present both before the first startup.

  • 1 of 20

    Write how long the warranty lasts

    Only one, broken down by part: panels, inverter, installation. That’s the right way to write it.

  • 3 of 20

    Write how long installation takes

    Only 3, and that’s mostly the time on the roof. The spec talks about 120 days until connection to the grid, and it’s worth explaining the difference.

  • 14 of 20

    Show a call button on the first screen

    Most of them. In a deal of this size most people want to talk to someone.

  • 13 of 20

    Show a WhatsApp button on the first screen

    More than half. A photo of the roof and an electricity bill make a natural message.

  • 18 of 20

    Load slowly on a phone

    Almost all of them. The main content appeared after more than 2.5 seconds, the limit Google defines as good.

How we checked: We searched in six areas, from the north to the Negev, and also for systems for farms and communities, and chose websites of installation companies. We left out quote comparisons, directories, price lists, news, equipment manufacturers and large developers, and 2 websites that turned out to be a waterproofing company and a modular building company weren’t counted. We checked the home page only, and we read the words on tariff, return on investment, approvals and warranty ourselves, on the desktop version too. Speed was measured with Lighthouse using a phone profile. Only the home page was checked, on 2 November 2026, once, on a phone screen. It’s a small, non-representative sample, so it shows a trend and not an exact market percentage. The names of the websites aren’t published.

The customer already has a spec. And the tariff may change.

In August 2025 the Ministry of Energy published a spec for the public: what to demand from an installer, and in what format to ask for a quote. On October 18, 2026 the Electricity Authority published a hearing on reducing the tariff. Both change what’s right to write on your website.

What the Ministry of Energy’s spec recommends, and what it means for your website
TopicWhat the spec saysWhat it means for the website
How many proposals It’s strongly recommended to get 3 to 5 proposals, from both a large installer and a small one. It’s advisable to ask for 2 to 3 references, and to also talk to an unhappy customer. Don’t fight this. Write that you’re in favor of comparing, and give references.
Price A total price for the project, a known installed capacity, once with VAT and once without. The installer states whether the registration and inspection fees are included. Show a sample proposal in the same format, and write what’s included.
Schedule 120 days are recommended from the agreement to connection to the grid, subject to approval to enter the quota. “3 days on the roof” is only part of the way. Write all of it.
Approvals A structural engineer’s approval and the approval of an inspecting electrician with a suitable license, before the first startup. Installation by an electrician with a suitable license. Write who approves at your company, and under which license.
Warranty For the system at least two years from connection to the grid, including fixing faults and claiming warranty from the manufacturers, and meeting the annual output the installer declared. Write separately: panel, inverter, installation, and whether you commit to an output.
The roof The work won’t harm the roof’s strength or waterproofing, and the installer repairs any damage they caused. On a concrete roof you don’t drill, you anchor to a weight on a bitumen membrane. This is the question everyone is afraid of. Write how you anchor, with a photo.
At handover A product file with the approvals and warranty documents, instruction, and a monitoring app. Tell what the customer gets in hand on handover day.

The table is shortened. The spec is a recommendation to the public for a system on the roof of a residential building, not a legal requirement, and it refers to a full engagement with an installer (not a partnership or a rental). Check whether a new version has come out.

  • The tariff: what’s true today, and what’s proposed

    Under the Electricity Authority’s decision of January 13, 2025, a system of up to 15 kilowatts gets 48 agorot per kWh, until December 31, 2026, with no indexation. The hearing of October 18, 2026 proposes a reduction for requests from January 1, 2027: in the authority’s table, for illustration only, 45.44 at the start of 2027, and 36.77 in 2030. This isn’t a decision yet. Next to every calculation, write which tariff it relies on, and when you checked.

    The Electricity Authority’s hearing (opens in a new tab)
  • Exempt from a permit, on conditions

    Under regulation 24 of the permit exemption regulations (⁧תקנות הפטור מהיתר⁩), installation on a roof is exempt from a permit on conditions, including Israeli Standard (ת"י) 62548, up to 700 kilowatts, not protruding beyond the roof’s outline, and notice to the licensing authority (⁧רשות הרישוי⁩) and the fire service (⁧כבאות⁩) within 45 days, with approvals from an electrician who is an engineer or practical engineer (⁧חשמלאי מהנדס או הנדסאי⁩) and a structural engineer. Only 2 websites touch on this. “No bureaucracy” isn’t accurate, and “we handle it” is.

    The regulations, regulation 24 (opens in a new tab)
  • A branch of your own in the Contractors Register

    The classification regulations (⁧תקנות הסיווג⁩) have branch 191: solar energy systems and photovoltaic cells. No website we checked mentions it or a contractor number. If you’re registered, write that and link to the Contractors Register (⁧פנקס הקבלנים⁩). The threshold for mandatory registration is set in the regulations, so check what applies to you.

    The classification regulations (opens in a new tab)

What to build on a solar installer’s website.

A solar installer’s website has to answer money questions, and hold up when the tariff changes. This is a good order to start from.

  • Home page: house, building or business

    Three paths, a work area, and a button for sending a photo of the roof and an electricity bill.

  • How much it returns, and why that changes

    The calculation, which tariff it relies on, and the assumptions. With a check date and a link to the Electricity Authority. This is the page you keep updating.

  • A sample quote

    In the spec’s format: capacity, price with and without VAT, what’s included, and whether the fees are in it.

  • Who approves what

    Structural engineer, inspecting electrician, the Israel Electric Corporation (⁧חברת החשמל⁩), notice to the licensing authority. Who does what, and what the customer gets in hand.

  • The roof

    How you anchor in concrete and tile, what about waterproofing, and what happens if it has to be taken down. Photos of your own work.

  • After installation

    Monitoring, washing, what happens with a fault, and warranty by component.

How people find you: Google, Maps and AI.

Searches here move between a product (“solar roof price”) and a new question (“2027 tariff”). Whoever updates an answer with a source and a date can show up both in Google and in the answers of AI tools.

  • Google Business Profile

    A service area if you go to the customer, the right category and real hours. Photos of roofs you’ve worked on, and ask for reviews after connection to the grid.

    Google’s guidelines (opens in a new tab)
  • Markup in the code

    The fitting type on schema.org is HomeAndConstructionBusiness. The markup says what the business is, what the phone number is and where you work, and it has to match what’s on the page.

    The type on schema.org (opens in a new tab)
  • Answers only an installer can write

    What happens to output after a few years at your customers’ homes, what causes faults, and when a roof isn’t suitable. Google recommends content from personal experience, not a summary of what’s already online. You tell the story, we help with the wording, and the final approval is yours.

    Google’s guide (opens in a new tab)

What’s true for all professionals, and what Google itself says about SEO and GEO: on the professionals page.

FAQ

Questions about a website for a solar installer

A question that isn’t here?

Write to us, and we’ll get back to you with an answer.

How much does it cost to build a website for a solar installer?

There’s no fixed price list. We set the proposal after a short call, based on the number of pages and who writes them. With a new website you start by seeing a first concept, and we move on to payment only when it suits you.

Have you built a website for a solar installer?

The work we show doesn’t include a solar installer’s website yet. This page is based on the check we described, and on the sources we read ourselves. At the start of the work we show you a first concept, so you can see if it suits you before you pay.

Should I write a return on investment?

Yes, if you write the assumptions next to it: tariff, capacity, price and date. The Ministry of Energy’s spec says a quote should include a profitability calculation, so the customer will look for it. Only 2 of the websites we checked give a number.

Should I write about the Electricity Authority’s hearing?

Yes, carefully. It’s a draft, and the numbers in its table are for illustration. Write what’s proposed, from which date, and link to the source, and update when a decision is made. One website we checked already does this, with an update date.

Should I write a price for a system?

If possible, a range and what affects it. Only one website we checked gives a number for a system on the home page. The spec talks about a total price and a known installed capacity, so write what goes into the price. Under the Consumer Protection Law, a published price has to be the total price.

How many years should I write that the tariff is guaranteed?

Under the authority’s 2025 decision, the tariff period is 26 years from receiving the distributor’s answer. The 2026 hearing proposes a uniform end date at the end of 2047. Check what applies based on the date of the request, and don’t write one number for everyone.

What about quote comparison sites?

The Ministry of Energy itself mentions that there are websites and apps that give proposals from installers, so a customer comes to you with numbers. Your website has to show what doesn’t fit in the table: work, references, and what happens with a fault.

Should I have a separate page for each city?

Usually not. Google cites pages that target cities and lead to the same place as an example of search abuse. It’s better to have a clear work area, and real work from it.

Contact

Want to see a concept for your website?

Tell us which area you work in, whether you install for homes or businesses, and which job you want more of. We’ll get back to you for a short call.

There is no fixed price list: the proposal depends on the scope of work and your needs, after an introductory call.

What interests you (optional)

Your details are used only to get back to you. Privacy policy