| When a registered contractor is required | Section 14 of the Contractors Registration Law (חוק רישום קבלנים): work whose financial scope goes beyond the range in the regulations is carried out only by a registered contractor. Under the regulations and the Registrar’s notice for 2026: above ₪56,750 on one construction site in a sub-branch, such as 131 renovations, and above ₪108,500 in a main branch. The amounts are updated every January 1 by the input price index for residential building. | If you aren’t registered, write on your website which jobs you take, and check with the Registrar of Contractors before you offer a job that might go over the amount. The regulations don’t spell out how to count a job that covers several branches. |
| Work on the structural frame | Regulation 2 of the financial scope regulations (תקנות ההיקף הכספי): work that concerns a building’s structural frame is carried out by registered contractors only, even if its financial scope is below the amount. | The regulations don’t define “structural frame.” In our reading, a load-bearing wall, a column and a ceiling are part of it. If you open up walls, write who does the work and who checks it. Who may plan moving a partition is set out on our page about interior designers. |
| Type K | Regulation 3א of the classification regulations (תקנות הסיווג): anyone who registers in branch 131 is classified as type K. Since an amendment published on February 23, 2026, type K allows work of up to ₪825,000 on one construction site, instead of ₪484,000. Under regulation 3ב you can ask to move up to type 1 after 12 months and three jobs on separate sites, each at least half the cap, or after two jobs at 70% of it. | Write “branch 131, type K” next to your number. A customer renovating an apartment understands from it that their job is within range, and doesn’t have to guess what “registered contractor” means. |
| Types 1 to 5 | In classification group A (קבוצת סיווג א׳), which also includes branch 131, under the amendment published on December 30, 2025: type 1 up to ₪1,927,000, type 2 up to ₪3,854,000, type 3 up to ₪7,708,000, type 4 up to ₪15,416,000, and type 5 with no limit. The scope is per construction site, excluding VAT. Regulation 6 updates the amounts by the index on April 1 and October 1. | Don’t write an amount on your website, because it changes. Write branch and type, and link to the register. And don’t show a project whose scope is bigger than your type. |
| The sign at the work site | The sign regulations (תקנות הצבת השלטים): a registered contractor puts up a clear sign at the construction site, at least one meter by one meter, with name, address, phone, registration number in the register, ID number or company number, the branches and the classification in each branch, and the same details for every contractor working on their behalf. | These are exactly the details worth putting on the website too, next to the name. The regulations don’t distinguish between a new building and an apartment being renovated, and we didn’t find an exemption for renovations in them. |
| Subcontractors | Regulation 2(11) of the regulations on “accepted practice” (הנוהג המקובל): a contractor doesn’t pass work they took on, in whole or in part, to a subcontractor who isn’t registered in the register. Employing workers isn’t such a transfer. Someone who regularly acts contrary to accepted practice isn’t entitled to registration (section 8 of the law). | When the website says “a team of professionals,” the customer asks who they are. Write who works for you, and who comes as a subcontractor and in what branch. |
| The register and the certificate | According to the register page of the Ministry of Construction and Housing (משרד הבינוי והשיכון), you can search for a contractor by number, name, town and branch, and print a certificate with a QR code that shows up-to-date details. A contractor can be frozen, excluded or suspended, and is then limited in the work they can do. | Attach the certificate to your price quote, and link to the register from the home page. If the status changes, what’s written on the website has to change too. |