| When a registered contractor is required | The Contractors Registration Law (חוק רישום קבלנים), section 14: engineering construction works whose financial scope or professional nature exceeds what is set in the regulations shall be carried out only by a contractor registered for that branch or sub-branch. Under the regulations and a notice by the Registrar of Contractors (רשם הקבלנים), published in Collection of Regulations 12400, from January 1, 2026 the amount is NIS 56,750 in a sub-branch and NIS 108,500 in a main branch, on a single building site, and it is updated every January 1. Structural frame work requires a registered contractor at any amount. Plumbing is sub-branch 190. | If you take on a big job on one site, like the piping for a whole building, check whether it exceeds the amount. If you’re registered, write your contractor number and branch on your website, and link to the register. |
| The title “contractor” | Section 6: a person shall not bear the title “contractor for engineering construction works,” or a title so similar as to mislead, unless they are registered in the register. Section 16 sets a penalty for anyone who uses the title without being entitled to it. | “Plumbing contractor” only if you’re registered. Otherwise, “plumber” or “plumbing services.” |
| Warranty on the work | The Contract for Work Law (חוק חוזה קבלנות), sections 3 and 4: work not done as agreed is a “defect.” The customer reports it within a reasonable time and gives an opportunity to fix it. If it wasn’t fixed within a reasonable time, they may fix it and claim reasonable expenses, and a defect whose repair is urgent may be fixed right away. The Consumer Protection Law: warranty terms are a material matter, and misleading about them is prohibited (section 2(א)(17)), and on a warranty certificate the business writes its own name and ID number (section 4ב). | The law gives the customer a right even without a certificate, unless agreed otherwise, and we didn’t find a fixed warranty period in it for plumbing work. What the website adds: for how long, on what (the work, or also the part you installed), and what isn’t included. If the product itself, like a water heater, is under the manufacturer’s warranty, write that separately. |
| “To standard” | The Planning and Building Regulations, Building Design, Sanitation (תקנות התכנון והבנייה, תכן הבנייה, תברואה), 5780-2019: the drinking water system and the drains shall be designed and installed according to Israeli Standard 1205, the standard for installing and testing sanitary installations, in permit applications. The Standards Law (חוק התקנים), section 9: it is prohibited to use in work a product to which an official standard applies if it doesn’t conform to it. Section 13: it is prohibited to describe a product in a way that creates the impression it was granted a permit for the standard mark, if it wasn’t. The Consumer Protection Law, section 2(א)(11): conformity to a standard is a material matter. | “We work to the standard” is a representation that can be checked. Write which standard, and which part of it, only if you really work to it. The standard mark is granted by permit to whoever manufactures a product (section 11), so its logo doesn’t belong next to your work. You can write that the pipes and fittings carry the standard mark, if that’s true. |
| Water bill after a leak | The Water and Sewage Corporations Rules, Service Standards (כללי תאגידי מים וביוב, אמות מידה לשירות), sections 14 and 15: unusual consumption from a leak is recognized if the consumer declared that the leak was fixed, attached “documentation attesting to the repair of the leak,” and applied within six months of the end of the billing period, and for no more than two consecutive billing periods. Section 52א: a consumer who doesn’t know the reason for unusual consumption, and asks to be billed by estimate, attaches “a confirmation signed by a plumber” that no signs of a leak were found, or another confirmation the corporation accepts, and a plumber’s confirmation includes the plumber’s details, the date of the check and a breakdown of the checks. The rules for regional councils, from 2024, contain the same requirements. | Your invoice or confirmation is the document the customer needs. Write in it what was found, where, and when it was fixed, and say on your website that you provide it. A “no leak found” confirmation needs the three details the rules list. |
| Home insurance and water damage | The Control of Insurance Business Regulations, Terms of Contract for Insuring Apartments and Their Contents (תקנות הפיקוח על עסקי ביטוח, תנאי חוזה לביטוח דירות ותכולתן), regulation 3: water damage is an extension to the standard policy, at the insured’s request and with the insurer’s consent. It covers damage from water escaping or leaking from the plumbing installations, but not the cost of the water, not wear, corrosion and rust of the water heaters, the pipes and the plumbing installations themselves, and not an apartment no one lived in for more than 60 consecutive days. Under the policy, the insured hands over the necessary documents, and the insurance benefits are paid within 30 days of the day the insurer has them (section 14). | Don’t write “insurance pays” or “a report acceptable to insurance”: the decision is the insurer’s, and a pipe that wore out is outside the coverage the regulations set. What you can promise: a report that describes what was found, where, and when, with photos. |